ICF100208OR FATIGUE DAMAGE AND REPAIR OF 250 kN PORTAL CRANE IN SHIPYARD Z. Domazet1, Z. Lozina1 and T. Pirsic1 1 Faculty of Electrical Engineering, Mechanical Engineering and Naval Architecture, University of Split R. Boskovica bb, 2100 Split, Croatia ABSTRACT The paper presents fatigue damage analysis and repair procedure that was carried out after the cracks at 250 kN portal crane were detected. After few years of crane service, fatigue cracks occurred at several critical points – bottom of the tower and both legs of portal. Previous attempts of repair by simple welding of cracks were not successful, because new cracks were detected soon after the repair. When cracks reached the critical length, the exploitation of the crane was stopped and detailed analysis was carried out. The results of numerical analysis and strain gauge measurements showed the source of a crack propagation – high stress concentration due to inappropriate design of portal details. FEM models also showed that stress concentration could be reduced by applying the additional stiffeners. Having in mind this fact, critical crane areas were redesigned. Later measurements and examinations showed that this repair was successful – after two years of intensive service new cracks were not detected. KEYWORDS: Fatigue cracks, repair, welding, FEM INTRODUCTION General rules for design the machine parts against fatigue are well known for many years, but still now the examples of inappropriate design can be found. This paper describes such example – heavy portal crane in shipyard: unusual portal box construction made of steel plates, Figure 3. The cracks occurred at transition areas from vertical to horizontal supports on both legs, growing from the corners and bringing into danger the whole construction, Figure 1. First cracks were detected soon after the crane was placed in the shipyard, so the allowed carrying capacity was reduced from 250 kN to 50 kN, but the cracks continued to grow. First attempt of repair by simple welding did not solve the problem – new cracks were detected in the same areas soon after the repair. When the cracks reached the critical values, the crane was stopped to avoid the risk of total failure. In order to find the source of crack initiation and growth, the complete manufacturer’s documentation and calculations were checked. It was found that calculations were performed by using the simple beam elements, without taking into account the stress concentration, and the influences of inertial forces and wind were underestimated. Those facts led us to perform the complete static and fatigue analysis, to measure the real stresses during the typical manoeuvres of the crane, and to redesign the critical places to avoid stress concentration. The results of this work including the later stress measurements are presented in this paper.
RkJQdWJsaXNoZXIy MjM0NDE=