Figure 1: Detected cracks (measures in millimetres) MEASUREMENT OF STRESSES, COD AND ACCELERATION To determine the dynamic behaviour of the construction strain gauges, two induction transducers for displacement and capacitive transducer for acceleration were applied. Test load was 50 kN, and there were no wind during the measurement. All data were recorded during the typical working cycles of the crane and results were presented by great number of diagrams. Figure 2: Measured stresses during typical manoeuvres Based on the analysis of these diagrams, some general conclusions can be set: - the highest measure stress amplitude were about 150 MPa, but in practice stresses can be higher, because of several reasons: - strain gauges were not attached at the places of highest stress concentration (access is not possible because of cracks) - stress concentration factor αk is about 2, what is not theoretical maximum - during the measurement, the secondary stresses that reached up to 20 MPa were recorded, not connected with the nominal stresses, probably caused by swinging of the tower - crack opening displacements reached 1.5 mm, what according to the Fracture Mechanics COD – concept indicates the stress of about 200-300 MPa
RkJQdWJsaXNoZXIy MjM0NDE=